
Gravel driveway installers near me delivering durable rebuilds with fabric, deep base, and crowned drainage that survive Wisconsin winters. Get a free quote today.
Build it right once, not twice: a better gravel driveway starts below the surface
If your driveway turns into soup in spring, sheds stone after every storm, or forms ruts no matter how often you grade it, the problem is not the top layer. It is the structure underneath. At Masterwork Construction, we rebuild gravel driveways with geotextile fabric, a deep compacted base, and a proper crown so water runs off instead of sitting on top. This approach creates a driveway that holds up through freeze and thaw, heavy rain, and daily traffic.
Since 2015, Masterwork Construction has served southeastern Wisconsin from our headquarters in Grafton. Our crews bring heavy civil earthwork experience to residential and commercial sites across Ozaukee, Milwaukee, Waukesha, and Washington counties. If you are searching for gravel driveway installers near me who understand Wisconsin soils and weather, our team is ready to help.
What makes a gravel driveway survive Wisconsin winters
Geotextile fabric that separates mud from stone
Geotextile fabric is the quiet hero of a driveway that lasts. It keeps your compacted base and surface gravel from punching into soft subgrade during spring thaw. It also acts as a barrier so fines from the soil do not creep up into your stone and trap water. Masterwork Construction selects fabric based on soil conditions and expected traffic. We often use a high strength woven geotextile for clay and wet pockets, and a nonwoven fabric where extra filtration is needed. The result is a stable platform that resists pumping and rutting.
A deep, well graded base that actually carries the load
Depth matters. We typically build 8 to 12 inches of compacted base stone for car and light truck traffic, and up to 14 inches or more at turnarounds and low spots. This stone is not the same as the top layer. We use angular, well graded base material such as 1.25 inch down to fines or 3 inch breaker rock where soils are weak. The angular shape locks together under compaction to create strength. A proper base spreads vehicle loads and reduces frost movement.
The right crown and slope so water moves off the surface
Water is the enemy of gravel driveways. We build a consistent crown of about 2 percent from the centerline to both edges to shed water. Where the driveway meets garages or roads, we plan transitions that still move water without creating bumps. On long drives we incorporate gentle cross slopes and relief points so water never runs straight down the lane and erodes your investment.
Drainage features that work all year
Good drainage does not end at the crown. We add shallow swales, culverts, and ditch shaping to route water to safe outfalls. We pay close attention to areas where snow banks build, because those piles can block spring meltwater. If you need help with stormwater utilities, Masterwork Construction also installs and repairs culverts, underdrains, and retention solutions that support your driveway and protect nearby structures.
A durable surface course that resists tracking and washouts
For the top layer, we recommend a compacting gravel with fines that lock, such as 3/4 inch crushed limestone with fines. In shaded or damp areas we sometimes specify a dense graded aggregate that sheds water better. The goal is a tight surface that stands up to turning wheels and stays where we put it. We avoid round stone on the surface because it rolls and ruts.
Moisture and compaction control for long term stability
Compaction is only as good as moisture content. Our crews wet or dry the stone as needed, then compact in controlled lifts with heavy rollers and plate compactors at edges. This method achieves density that resists settlement and keeps your crown locked in through winter.
Edge support that keeps the shape
Edges take abuse from plows and tires. We build full thickness edges and, where needed, add edge restraints or a slight shoulder to keep the crown intact. In soft soils, we can widen the base layer past the travel lane for extra stability.
Our step by step rebuild process
- Site walk and plan. We review soil conditions, drainage patterns, traffic needs, and snow plow practices. We flag drainage paths, culvert inlets, and any utilities. We document problem spots like springs or organic pockets.
- Strip and proof roll. We remove unstable material, organic soils, and trapped fines. We proof roll with equipment to locate soft zones, then undercut and stabilize as needed.
- Install geotextile fabric. We lay the appropriate fabric with tight overlaps and proper anchoring. Seams are overlapped in the direction of travel to prevent stone migration.
- Place and compact base stone. We place base in 4 to 6 inch lifts and compact each lift to target density. We shape the base with the correct crown and transitions.
- Fine grading and drainage adjustments. We cut in shallow swales, set culverts to proper grade, and create outlets that will not erode. We coordinate with stormwater improvements if required.
- Apply surface course. We spread the chosen top course evenly and compact to a tight surface. We check the crown and adjust until water flows off as designed.
- Final roll and quality check. We roll until the surface is dense and smooth. We test drainage with water where needed and verify that culverts and swales perform.
- Care guide and follow up. We share plowing and maintenance tips, recommended regrading intervals, and an estimate for touch up stone in the future. We stand behind our work and are one call away.
Materials we trust for Southeast Wisconsin conditions
Not all gravel is equal. The right mix depends on your soil, slope, use, and budget. Masterwork Construction sources local, tested aggregates that perform well in freeze and thaw cycles.
- Geotextile fabric. Woven for strength on clay and saturated subgrade. Nonwoven for filtration where groundwater movement is a concern.
- Base layer. 1.25 inch down to fines dense graded aggregate for most builds. Breaker rock or 3 inch minus in very weak soils, then capped with dense base.
- Surface course. 3/4 inch crushed limestone with fines for a tight, low dust finish. Alternatively, crushed granite where limestone tracking is a concern.
- Stabilization options. Underdrain tile, riprap at outlets, and recycled asphalt millings in select locations where added binding is helpful.
- Edge support. Extra base width, shallow shoulder, or minimal edging where lawn meets stone, so the crown remains intact after plowing.
Signs you need more than a quick regrade
- Ruts return within weeks of grading or fresh stone.
- Standing water stays on the driveway after a rain.
- Soft spots pump water or mud up through the rock.
- Seasonal frost boils or heaving that never fully settle.
- Stone migrates into the lawn or ditches after storms.
- Surface sits below surrounding grade, creating a bathtub effect.
- Old fabric is torn or absent when you scrape the surface.
Cost, timeline, and value
Every site is different, but most residential rebuilds take two to five days depending on length, drainage work, and weather. Costs depend on excavation, fabric type, base thickness, and the number of culverts or swales. A properly rebuilt driveway is a long term investment that reduces annual grading and replacement stone, prevents car damage, and improves curb appeal. It also protects your yard and home by moving water where it belongs. Masterwork Construction provides clear estimates, options, and value engineering to balance performance with budget. We often find savings through careful grading, recycled on site material where suitable, and scheduling efficiencies with our modern equipment.
Winter performance tips for plowing and maintenance
- Set the plow shoes. Keep the blade just above the surface to avoid peeling off the top course.
- Push snow to low sides. Avoid stacking at driveway high points or blocking ditch outlets.
- Avoid ruts before a freeze. If a thaw creates soft areas, limit heavy traffic until the surface refreezes.
- Clear culvert inlets after storms. Ice and leaves can dam meltwater and pond on the drive.
- Light spring touch up. A quick rake and roll in spring keeps the crown defined and prevents potholes.
- Add surface stone as needed. A thin top dressing every few years maintains a tight, smooth finish.
Why choose Masterwork Construction
Masterwork Construction is more than a driveway contractor. We are a professional earthwork company with deep experience across excavation, grading, stormwater utilities, mechanical demolition, roadway construction, pond development, and site development. That broad skill set matters when you need a driveway that works with the land rather than against it. We use modern equipment, proven methods, and experienced craftsmen. Safety, integrity, communication, and respect guide our work on every project. We are local to Grafton and know the soils and weather patterns across Ozaukee, Milwaukee, Waukesha, and Washington counties.
- Established in 2015 and focused on durable, functional results.
- Heavy civil capabilities for reliable drainage, culverts, and grading.
- Value engineering to optimize costs without cutting corners.
- Clear scheduling, clean sites, and respectful crews.
- Long term relationships with homeowners, builders, and municipalities.
Looking for gravel driveway installers near me in Southeast Wisconsin
If you have been typing gravel driveway installers near me and sifting through results, choose a team that builds for Wisconsin winters, not summer brochures. Masterwork Construction designs and rebuilds driveways that drain with geotextile fabric, deep base, and a defined crown. We combine quality materials with precise grading and compaction for a driveway that stays strong year after year.
Service areas
Masterwork Construction serves southeastern Wisconsin. If you live in or near these communities, we can help.
- Ozaukee County. Grafton, Cedarburg, Mequon, Port Washington, Thiensville, Saukville, Belgium, Fredonia.
- Milwaukee County. Milwaukee, Oak Creek, Franklin, Greenfield, South Milwaukee, Shorewood, Whitefish Bay, Brown Deer.
- Waukesha County. Brookfield, New Berlin, Waukesha, Pewaukee, Menomonee Falls, Sussex, Hartland, Oconomowoc, Muskego.
- Washington County. West Bend, Germantown, Jackson, Hartford, Kewaskum, Richfield, Slinger.
Frequently asked questions about gravel driveway rebuilds
How long does a rebuild take
Most residential projects take two to five days once equipment is on site. Add time if we are installing culverts, underdrain, or major stormwater features. Weather and material deliveries also affect schedule. We provide a clear timeline before we start.
How thick should the base be
For cars and light trucks, aim for 8 to 12 inches of compacted base over geotextile fabric. For heavy use areas like turnarounds, delivery lanes, or RV parking, increase base depth. The exact thickness depends on soil strength and traffic.
Do I need permits
Most driveway resurfacing does not require a permit, but new culverts, changes to driveway location, or work within a right of way may trigger local approvals. Masterwork Construction checks local rules and can coordinate with your municipality if permits are needed.
Can you reuse my existing gravel
Often yes. We screen and regrade existing stone if it is clean and angular. If the material is contaminated with fines or organic soil, it is better to remove it and start fresh over fabric to avoid future problems.
How often will I need maintenance
Expect light spring maintenance and a thin surface top up every few years, depending on traffic and plowing. With proper crown and drainage, maintenance is simple and affordable compared to constant regrading on a weak base.
What if my property has standing water
We design drainage to handle wet ground. Solutions include swales, culverts, minor regrading, and in some cases underdrain. As a full service earthwork contractor, Masterwork Construction can integrate stormwater measures that support your driveway and yard.
Beyond driveways: full site solutions
Because we handle excavation, grading, stormwater utilities, and roadway construction, we can solve root causes that simple resurfacing misses. If your driveway fails due to hillside runoff, we can reshape ditches and install culverts. If your lot needs drainage relief, we can add a pond or underground retention. If you are planning a new garage, barn, or addition, we can coordinate driveway access with foundation excavation and backfill. That is the advantage of working with Masterwork Construction.
What to expect when you contact us
We start with a conversation about your goals, issues, and budget. We schedule a site visit to review soils, drainage, and access. Then we provide a detailed scope with options, line item pricing, and a proposed schedule. We explain the benefits of geotextile fabric, base depth, and crown so you know exactly what you are getting. During the build, we keep you informed and keep the site tidy. After completion, we walk the project with you and share simple maintenance tips.
Get a free quote from Masterwork Construction
Stop searching for gravel driveway installers near me and talk to a local team that builds for durability. Call Masterwork Construction at 414-762-7000 to schedule your site visit. We serve Ozaukee, Milwaukee, Waukesha, and Washington counties with gravel driveway rebuilds that drain and last. If you prefer to reach us online, visit our website and send a message. We look forward to helping you build a driveway that survives Wisconsin winters and looks great all year.